Section 04 · Sequencing the Program
Method4.2
Hand off the program
This step closes the methodology. Hand the ranked gaps from Step 4.1 to the decisions that follow, with everything those decisions need from each record. Record the ranking method and its settings once for the program, so the order can be reproduced.
The order reflects need and priority, not deliverability. Feasibility, cost, ownership, funding, and the choice of specific interventions belong to the processes that follow. Note them as each gap’s open questions rather than resolving them here.
Flux walkthrough4.2
Review the program
Colorado Connector Fort Collins, Colorado · CO Base
Open the report
Saving the review produces the report: the priority-ordered program, the Priority Areas and their designations, each gap with its verdict, evidence, and note, and the data sources used. Nothing is compiled by hand; the report is a live draft that follows the analysis until it is saved or printed. It also has space for an introduction and can be printed or exported to PDF.

The report as saved: subject, catchment, objectives, and ranking method in the header, and the priority-ordered program as its first section.